December 2007: Let the demolition begin! AK poses with the first wall to go down.
|
|
|
|
Removing asphalt to make way for the addition
|
|
|
|
What a mess!
|
|
|
|
The rain finally quit long enough to let them finish the job
|
|
|
|
The temporary doctors' office lets the doctors monitor their patients extra closely! (fortunately they got to move into the new office in August)
|
|
|
|
|
Dr. Singh shows off the new foundation
|
|
|
|
The framing begins...
|
|
|
|
Looking into the new boarding area
|
|
|
|
The old exterior wall has been removed; this shot looks into the boarding/grooming area and one of the new bathrooms (right)
|
|
|
|
Looking into the new bathroom and cat boarding suite (not framed yet)
|
|
|
|
|
New windows, electrical panel, and stucco in progress
|
|
|
|
New "porch" area in back
|
|
|
|
Getting ready for the roofers
|
|
|
|
Kennel and grooming area windows
|
|
|
|
Back of the building - moving right along! 2/13/08
|
|
|
|
|
4-15-08 The first layer of stucco is done.
|
|
|
|
One of the new bathrooms, which is accessible from our waiting room.
|
|
|
|
The bright and sunny cat boarding room. The top cat cages will have clear backs which will look out the back of the building.
|
|
|
|
This is where our brand new dog kennels will be.
|
|
|
|
Installing our new flooring: 100% recycled rubber by Noro flooring
|
|
|
|
|
Our new tub. A pull out ramp makes it easy for big dogs to get in too! Also the new
|
|
|
|
Forrest enjoys a bath in our new tub
|
|
|
|
Getting ready to assemble the new kennels
|
|
|
|
Kennel assembly was quite a project!
|
|
|
|
The new kennels are all done.
|
|
|
|
|
Shower in the back bathroom to encourage employees to ride their bikes to work (Dr. Singh does at least once a week)
|
|
|
|
Our bright green xray room
|
|
|
|
Looking from the old to the new
|
|
|
|
Dr. Wright works in the new doctors' office (which will soon have new cabinets and counters)
|
|
|
|
8-08: Our reception area is all torn up! You may recognize this area - it is where our scale used to be.
|
|
|
|
|
The reception desk and benches are all torn out.
|
|
|
|
Looking across reception area (front door is the green door on the right) to our new exam room, framed in and ready for drywall.
|
|
|
|
View from the area where our scale used to be into new reception/waiting area
|
|
|
|
Exam room with new cabinets (will get new floor and furniture)
|
|
|
|
Temporary reception area - future isolation area
|
|
|
|
|
Our temporary waiting room - future cat boarding room
|
|
|
|
A sneak peek at our new reception area
|
|
|
|
|
The final stage begins! We all took turns helping to knock down the final wall, making room for our much bigger and more comfortable treatment area.
|
|
|
|
The wall is gone!
|
|
|
|
|
Treatment area. The walls in the hallway will be torn down as well, after a support beam is installed above.
|
|
|
|
|
Doing electrical work in the treatment room
|
|
|
|
Finishing up the pharmacy
|
|
|
|
New cat condos
|
|
|
|
|
Treatment area ready for cabinets 12-05-08
|
|
|
|
Flashback: Madi and Alex in our old treatment room - one year ago ... the new treatment room is so much bigger!
|
|
|
|
|
Finishing up the reception area
|
|
|
|
Our treatment room is almost done!
|
|
|